Who Rides Transit? – An illuminating illustration by The Infrastructurist

May 26, 2009 at 1:32 pm

(Source: The Infrastructurist)

Our friends at The Infrastructurist compiled the national results from that study and compare them with the demographics of transit systems in three U.S. cities: Washington, D.C., Portland, Oregon, and San Francisco (well, the Bay Area). The snapshot offers an intriguing insight into which Americans choose not to drive to work.

If FTA can spend a bunch of money on such a compilation for the entire US,  that would greatly benefit many of our professionals engaged in transportation planning & policy research.  An analysis on the issue of social equity and its underpinning to transportation alternatives would be very helpful to say the least as the country’s demographics has undergone a signficiant shift in the past decade or two.

Scoring the New Starts Report, from the Transit perspective

May 10, 2009 at 10:58 pm

(Source: The Transport Politic)

The Federal Transit Administration releases its budget for FY ‘10, and recommends new transit capital projects

On Friday, the Obama Administration released details on its proposed budget for fiscal year 2010. The recommended appropriations affect each agency, and will have to be approved by Congress in a succession of relevant bills before they become law, but since Democrats control both the executive and legislative branches, there are likely to be few divergences from the President’s proposals.

The Federal Transit Administration’s budget will increase to $10.34 billion this year, up from $10.23 billion in FY 2009. These amounts were set in stone by the 2005 surface transportation bill, SAFETEA-LU, so there was little expectation that the President would propose massive increases in funding for public transportation. However, the budget significantly expands funding for New and Small Start transit capital projects, from $1.57 billion in ‘09 to $1.83 billion in ‘10. ARRA stimulus funds were included in FY ‘09.

Because the dedicated highway trust fund, which funds highways and transit and which relies on fuel tax revenues, is running out of cash as people drive less and automobiles become more frugal, the government needs a new source of funds for transportation. This year, as in 2008, the Hosue and Senate will likely have to divert general fund revenues to compensate, and the budget assumes that fact, proposing that a large percentage of both transit and highway money be appropriated directly by the Congress.

Along with the general budget, the Department of Transportation released itsannual New Starts Report. This document, which is well worth reading through if you have the time, documents the federal government’s commitment to funding new transit corridors in the United States. The FTA rated and recommended a number of new corridors for funding — five major New Starts projects and five Small Start projects in addition to several already announced over the past year.

This is the last New Starts report before the writing of the next transportation bill, which may include important changes in the way projects are funded, and which is likely to significantly increase expenditures for transit capacity expansion project such as those charted below.
—–
This Year’s FTA Project Ratings
New Starts Recommended for FFGA
Project Total Cost 2030 Riders (new)
Starts Share Rating Federal $/Rider ($/New R)
Orlando, FL – Central Florida CR $356 m 7,400 (3,700)
50% MEDIUM 24 k (48 k)
New York, NY – ARC CR $8.7 b 254,200 (24,800)
34% MED-HI 12 k (119 k)
Sacramento, CA – South LRT II $270 m 10,000 (2,500) 50% MEDIUM 14 k (54 k)
Houston, TX – North LRT $677 m 29,000 (7,500)
49% MEDIUM 11 k (44 k)
Houston, TX – Southeast LRT $681 m 28,700 (4,500)
49% MEDIUM 12 k (74 k)
New Starts In Limbo
Project Total Cost 2030 Riders (new)
Starts Share Rating Federal $/Rider ($/New R)
Boston, MA – Silver BRT III $1.7 b 85,900 (13,700)
60% MED-LOW 12 k (74 k)
Miami, FL – Orange North HR II $1.3 b 22,600 (13,000)
47% MED-LOW 27 k (47 k)

Click here to read the rest of this interesting analysis (Note: It is a lengthy analysis too).

New York City Averts Transit Meltdown with New Payroll Tax

May 6, 2009 at 3:22 pm

 (Source: The Transport Politic)

State Senate finally comes to agreement on system’s adequate funding; will vote today

The Metropolitan Transportation Authority, which has been threatening huge fare increases and drastic cuts in service, will be able to rest easy tonight, because its multi-billion-dollar budget deficit will be covered by a new, more stable source of revenue: a region-wide payroll tax. There will be no bridge tolls, but a small fare increase. Though this is no panacea, and more funding is still needed, but this is huge news for New York City and means that the city will continue to be able to offer its citizens high-quality transit at a reasonable price.

The solution — held up for weeks by the demands of a few Democrats in the Senate (no members of the GOP are willing to vote for the program) — was found by agreeing to reimburse school districts that are affected by the tax. 

According to Gotham Gazette (via 2nd Ave Sagas), the plan to be voted on this afternoon will raise a total of $2.26 billion a year for the transit agency. This plan will cover the $1.8 billion MTA’s budget gap for FY 2009 and the $2 billion gap for 2010 as well as provide a small amount for capital expenditures. The New York Timesclaims that the taxes will be enough to cover the first two years of the agency’s 2010-2014 capital program. The state is likely to have to get going over the next few months to shape a funding system for necessary subway and commuter rail repairs as well as expansion needs.

Here are the basic conditions:

  • 34¢/$100 payroll tax in all 12 MTA counties, with no differences between them (meaning people in Manhattan pay the same amount as people in Nassau County, even though people in the former clearly are more likely to take advantage of the transit system than those in the latter): $1.5 billion/year.
  • 10% fare increase, will likely raise the cost of a single ride to $2.25 from $2 today; monthly unlimited cards will go from $81 to $89: $500 million/year.
  • 50¢ surcharge on taxi rides: $85 million.
  • $25 vehicle registration fee on the MTA region: $130 million.
  • Increase on car rental fee: $35 million.
  • Increase on driver’s license fee: $10.5 million.

The plan also foresees fare hikes of 7.5% in 2011 and 2013 to keep up with inflation.

Click here to read the entire article.

Streetsblog Special – What’s Wrong With SAFETEA-LU — and Why the Next Bill Must Be Better

April 27, 2009 at 2:25 pm

(Source: Streetsblog)

Ultimately, SAFETEA-LU’s greatest failing may have been its failure to articulate a truly multi-modal vision for the nation’s surface transportation network. Essentially a continuation of 1950s-era policies, it repeated the same-old same-old about a need to complete the Interstate highway program, directing billions of dollars to state DOTs to pour asphalt and expand roadways. Nowhere did the legislation suggest a need to adapt to a future in which American dependence on automobiles and fossil fuels must be dramatically reduced. That’s the challenge faced by Congress today.

Less of this...

 Transportation funding from Washington has been heavily weighted toward highway spending ever since President Eisenhower first proposed the Interstate Highway Act in 1956. SAFETEA-LU, 2005’s federal transportation bill, was no exception. It provided $244.1 billionover five years, its revenues raised by the federal gas tax and directed to the Highway Trust Fund, which has both highway and mass transit accounts. $40 billion a year went to highways, most of which was used to expand and upgrade the Interstate highway system; some $10 billion went annually to mass transit.

The $10 billion in public transportation funds is distributed by the Federal Transit Administration (FTA) for a variety of uses. The FTA administers the urban areas program, which allocates money to metropolitan areas for transit system capital expenses, as well as a rural areas program that helps states pay for rural transit. SAFETEA-LU also included a fixed-guideways formula, aimed at keeping mostly older rail transit systems like those in Chicago or Boston in working condition. Finally, the New Starts/Small Starts program allowed the FTA to fund competitive grants for major capacity expansion such as new subway or bus rapid transit lines.

More of this...

 SAFETEA-LU provided for $40 billion in annual funding from the highway account, the traditional federal source for financing Interstate highways. But under the law, money from the account could actually be spent on more than just roads. Roughly $6.5 billion per year was allocated to the “Surface Transportation Program.” States were allowed to use this money to fund transit and “bicycle transportation and pedestrian walkways.” The “Congestion Mitigation and Air Quality Improvement Program” — about $1.7 billion a year — went to projects likely to reduce pollution, and specifically forbade funding “a project which will result in the construction of new capacity available to single occupant vehicles.”

There’s one problem, though. The federal government may allow such funds to be spent on non-auto uses, but that’s rarely the case.

That’s because, while each metropolitan area has a federally-mandated Metropolitan Planning Organization (MPO) whose role is to establish priorities for transportation investments, state departments of transportation have ultimate discretion over how national highway funds are used. The inevitable consequence? Asphalt-happy DOTs usually choose to invest highway funds in roads, even when MPOs advocate for improved transit or bikeways. According to Transportation for America, only five states — California, New York, Oregon, Pennsylvania, and Virginia — have taken advantage of the flexibility of these funds. The rest have spent the vast majority on auto infrastructure.

What’s more, SAFETEA-LU made it easy for states to build roads and hard for them to build transit projects. While funds for new roads were simply distributed to states based on a formula, new transit lines had to undergo the rigorous New Starts process — competing with other projects from all over the country — before winning a share of federal dollars. There was no such required audit for road projects.

Click here to read the entire article.

The TransportPolitic scoops more details on the Federal High-Speed Rail Strategic Plan

April 19, 2009 at 1:25 pm

(Source: The Transport Politic)

Proposal reveals a little – and a lot – about how the administration wants to proceed with its rail programs

As many of you commented in the previous, and unfortunately inadequate, post on the administration’s high-speed rail strategic plan, the report – though significant – doesn’t tell us all that much more about how the U.S. government will spend the $8 billion approved for fast rail by Congress in the stimulus bill. On the other hand, I want to point out that the administration never promised such information: for god’s sake – the states haven’t even submitted their proposals for the use of the funds yet! I think that our collective enthusiasm for rail projects may be getting a bit ahead of reality.

But I think the report’s basic outlines of the kinds of projects the federal government wants to fund with rail money are demonstrative of the administration’s seriousness in undertaking this project. By arguing that high-speed rail is most applicable for corridors between 100 and 600 miles in areas of moderate to high density, we can be assured that the government won’t be funding just any project with the limited funds available for rail. It’s good to know, in other words, that a line between El Paso and Phoenix isn’t going to get money over the connection between San Francisco and Los Angeles.

The report’s attempt to define different qualities of rail is also an admirable response to the fact that no one thus far has been able to come up with a concrete series of words that can be used to provide meaningful definitions of different types of rail services. I think there’s been a major problem in discussions about high-speed rail because of the lack of uniform agreement about what the term means, so it’s nice to have officially-sanctioned definitions. For the time being, I’ll attempt to incorporate them into the transport politic:

  • HSR-Express – 200-600 miles apart, more than 150 mph, dedicated rights-of-way.
  • HSR-Regional – 100-500 miles apart, 110-150 mph, some shared track with positive train control
  • Emerging HSR – 100-500 miles, with 90-110 mph speed service – developing the passenger rail market
  • Conventional Rail – 79-90 mph
  • IPR – Intercity passenger rail

Click here to read the entire article.

These days rail looks very attractive to Politicians! Infrastructurist Compares New High Speed Rail Projects Around The World

April 8, 2009 at 11:59 pm

(Source: Infrastructurist)

Image: Infrastructurist

Everywhere you look, from Argentina to Saudi Arabia, there’s a country planning a new high-speed rail line.  Contributor Yonah Freemark offered this incredible, easy to understand graphical depiction on Infrastructurist, which compares seven lines on four continents that are either in the engineering phase or already under construction. They range in size from the diminutive 34-mile project that will connect Jerusalem and Tel Aviv to the gargantuan 818-mile link between Beijing and Shanghai. The variations in construction cost per mile and local meaning of the term “high speed” are almost as great.